5MW Off-Shore WEC
5MW Wind Energy Converter for Off-Shore Application
An international consortium coordinated by WIP developed a 5 MW off-shore wind generator for pilot operation.
|
This involved the development of the actual hardware, the installation and operation of the WEC prototype and the verification of its performance in an extended pilot operation with the aim to prepare basic development for further industrial exploitation.

E-112 with 114m rotor diameter installed near-shores at Emden by Enercon using the technology developed within this project. This near-shore WEC is operated by Enova. The turbine demonstrates superior performance and high yields.
|
|
|
Project Acronym:
5MW Off-Shore WEC
Duration: 2001 – 2006
Status: Completed
Web: No project web site available
Contact:
This email address is being protected from spambots. You need JavaScript enabled to view it.
+49 89 720 12 737
|